Bench Test / KickingHorse / F130

Test intent

Tools and setup

Pre-power checks

Check Expected condition Result
Torch front-end assembly left-hand-thread seat and right-hand-thread tip assembled correctly pass / fail
Wire path baseline free feed with tip removed on the factory 0.035 in setup or a proper 0.030 in conversion only pass / fail
Clamp and current path tight and clean pass / fail
Input source real 120 V / 20 A branch or stable 3 kW generator path with no hot adapter or non-compliant cord pass / fail
Unsupported setup check no 0.023 in wire and no wire that requires DCEP pass / fail

Electrical and control checkpoints

Checkpoint Expected value or behavior Record actual
Trigger-state voltage before trigger about 12 VDC class low-state value
Trigger-state voltage after trigger rises into about 44 VDC working-state range
OCV baseline about the official 46 V class baseline
Feed behavior at idle stopped until trigger command
Arc behavior with fresh front-end stable enough to prove the machine before deeper repair on correct 0.035 in baseline
Protection light behavior stays off during a short proof weld on the correct source baseline

Functional proof

Test Pass condition Result
Stable startup no immediate breaker trip or abnormal idle state pass / fail
Trigger feed feed starts on command and stops cleanly pass / fail
Short FCAW proof weld stable weld with no severe stubbing or front-end flare on the correct 0.035 in baseline pass / fail
Optional 0.030 in retest only if conversion hardware is correct; no new fault created by proper conversion pass / fail / n-a
Warm restart no repeat trip, protection-light event, or sudden loss of feed pass / fail

If it fails

Direct official parts pages

Post-repair release

Signoff item Result
Stable startup restored pass / fail
Trigger-state split behaves normally pass / fail
0.035 in baseline or correct 0.030 in converted baseline restored pass / fail
No repeat trip, severe stubbing, protection-light event, or front-end complaint after power cycle pass / fail
Correct source baseline documented on release ticket pass / fail

Technician: __________ Date: __________ Serial or shop tag: __________