This annex is for complaints caused by excessive lead length, extension cords, or voltage drop under load.
Use it with:
If the machine is being run through long cords or long lead sets, source and path losses belong in the first diagnostic branch.
| Symptom | Most likely path-loss branch | High-value first move |
|---|---|---|
| Weak arc on site but fine in shop | extension-cord voltage drop | remove cord and retest direct |
| Breaker trips or machine feels soft on 120 V | long light-gauge cord or weak branch | move to direct correct circuit |
| Plasma weak on heavy material | cord loss plus lower-voltage input | retest on direct higher-voltage service |
| Engine-driven weld weak with long leads | heated lugs or lead-path loss | shorten path and inspect lead temperature |