This reference defines how repairs should be closed so a machine is not returned with the original fault still hiding in the setup, accessory path, or load condition.
Universal close-out steps
- Reassemble the machine fully and confirm no covers, strain reliefs, or grounds were left loose.
- Restore the machine to a known-good baseline process before retesting specialty features.
- Repeat the original complaint path if it can be done safely.
- Verify the repair both from a cold start and after the machine has warmed up enough to expose intermittent faults.
- Record the exact accessory package and power source used for verification.
MIG and flux-cored verification
- Perform a bare-wire feed test with the tip removed.
- Reinstall the correct tip and run repeated weld starts on clean steel.
- Confirm no abnormal heating at the clamp, front connector, power plug, or gun neck.
- If the original complaint involved pulse, spool gun, or aluminum, prove the standard steel MIG baseline first and then retest the specialty path.
TIG and stick verification
- Confirm gas pre-flow, start behavior, arc stability, and post-flow.
- Prove local control first, then retest pedal or remote if that was part of the complaint.
- For AC/DC TIG, retest the same AC or pulse feature that originally failed after a stable DC or simple baseline is proven.
- For stick complaints, retest with a known-good rod on clean plate and verify output-lug and clamp temperature.
Plasma verification
- Retest on known material thickness with known-good clamp placement and dry air.
- Separate manual handheld verification from mechanized verification.
- Confirm pilot behavior, transfer, cut quality, and post-cut fault state.
- If the complaint was cartridge, torch, or consumable related, verify that recent faults do not immediately return with a known-good consumable path.
Multiprocess verification
- Prove one healthy baseline process first.
- Retest the exact process that originally failed only after the shared power-source path is proven.
- If the complaint followed a process change, power cycle and retest the machine in both the baseline process and the complaint process.
- Confirm lead placement, polarity, and accessory package before closing the repair.
Engine-driven verification
- Verify start, idle, governed speed, and warm restart.
- Confirm weld output under load and auxiliary output under load if the machine provides both.
- Retest with the same feeder, remote, or compressor load that exposed the fault if applicable.
- Do not close the job on idle-only validation.
Do not close the repair if
- the machine only works on a different power source than the one used by the customer and the cause of that difference is not explained
- the machine only works with a substitute accessory and the original accessory has not been bounded or condemned clearly
- the machine passes cold but fails hot and the hot condition was not reproduced
- the original fault code or warning returns during verification