F130 Board Opening Map

This is the fast internal opening map for F130 once the front end, wire path, wire-size setup, and source-quality branches are already bounded.

Open Only After Proving

First Internal Targets

Board or internal group Open first when... Key connector or checkpoint Best local file to open first
Trigger and control branch before-trigger and after-trigger behavior does not split correctly about 12 VDC class before trigger and about 44 VDC class after trigger F130 workbook sheet
Output and current-path branch feed is normal but the arc still does not behave correctly after front-end and wire-size proving output path after external branches are clean and 46 V class OCV is not sustained B.067RM.600-C.pdf
Generation-specific control branch fitted board family may not match the machine age post-March-2017 board arrangement B.067RM.601-D.pdf and F130 workbook sheet

Connector and Board-Family Reminders

External Parts Exit Paths

Stop Rules

Open Next