MAG211 Board Opening Map

This is the fast internal opening map for MAG211 once chart, gun, spool-gun, and drive-roll branches are already bounded.

Open Only After Proving

First Internal Targets

Board or internal group Open first when... Key connector or checkpoint Best local file to open first
Gas-valve or control branch feed is present but gas behavior is still dead or erratic gas-solenoid branch around trigger action mag211manual.pdf and workbook
Capacitor or output-smoothing branch rough arc stays with the machine after chart and gun proving output smoothness and ripple feel under load workbook sheet MAG211
Feed-control branch bare-wire feed is still unstable after external path proving drive response with correct wire path workbook sheet MAG211

Connector and Board-Family Reminders

External Parts Exit Paths

Stop Rules

Open Next