This checkoff decides whether a trainee is ready to use the WeldKing workflow on supervised live customer units. It does not authorize independent repair work. The trainer should use it only after the trainee finishes the WeldKing progression and demonstrates stable document-order discipline.
| Area | Trainee must demonstrate | Evidence source | Pass standard |
|---|---|---|---|
| Complaint classification | names the complaint family correctly before opening diagrams | drill response and instructor observation | correct on all staged complaints |
| First proof step | states the first external proof step before touching internal references | drills, answer keys, and live questioning | no skipped first-proof step during the checkoff |
| Document order | moves through router, measurement card, substitution path, and full guide in the right order | observed drill flow | no random document hopping and no skipped stop rule |
| Measurement discipline | takes the expected reading in the correct state and explains what it means | bench simulation and answer-key review | readings are taken in the right place and interpreted correctly |
| State and setup discipline | resets or strips to local control when the complaint family requires it | PulseWave200 and MultiSonic220 drills | no panel-state or process-state confusion left unresolved |
| Substitution discipline | proves the easiest external assembly before proposing internal repair | CoolArc160, PulseWave200, and MultiSonic220 drills | no premature board suspicion while external proof remains available |
| Internal escalation discipline | identifies the exact stop point where internal access becomes justified | all drills and trainer questioning | escalation threshold is stated clearly and consistently |
| Communication and closeout | explains the branch taken, evidence gathered, and next action clearly | trainer interview and score sheet | explanation is concise, ordered, and technically coherent |