Job Packet / KickingHorse / A220

Packet use

Intake snapshot

Item Record
Serial or shop tag
Exact complaint
Input source as found
Breaker rating and cord or adapter path
Clamp and holder condition on arrival
Lead polarity as found
Extension cord or adapter path
OCV reading if already checked

Likely parts and accessories to stage

Item Why stage it early
Known-good heavy-duty clamp fastest way to remove current-path false faults
Known-good holder branch separates holder wear from machine output loss
Meter for source and OCV checks needed for utility-path and current-path proof
Dry 7018 or 6010/6011 rods for baseline and higher-load proving keeps top-end complaints honest
Known-good 230 V or healthy 5 kW generator source proves the machine on its official power baseline

Official parts-entry shortcuts

First branch decisions

If you see... Stay in this branch first
Better outlet or shorter cord changes the complaint utility path
OCV normal but rod behavior is still poor clamp and holder branch
Clamp, holder, or plug heats quickly current path
Weak only at the top end real 230 V source and current-path branch
Arc feels wrong only after lead service or setup change polarity and external current-path branch
Complaint only exists on improvised TIG use stop there because the machine is officially not for TIG welding

Local files to open first

Bench workflow

  1. Normalize source, breaker, cord or adapter path, clamp, holder, and polarity.
  2. Run A220 bench test.
  3. Separate utility-path, current-path, wrong-polarity, and true output complaints.
  4. Retest at the higher end only after the baseline is healthy.

Release signoff

Check Result
OCV restored pass / fail
High-load rod baseline restored pass / fail
No abnormal heating, protection light, or source-path collapse pass / fail
Covers, grounds, and lead routing restored pass / fail

Technician: __________ Date: __________