Job Packet / KickingHorse / P40

Packet use

Intake snapshot

Item Record
Serial or shop tag
Exact complaint
Start, pilot, transfer, or cut-quality complaint
Air source and pressure-under-flow condition
Clamp placement on arrival
Torch front-end condition
HF behavior on arrival
Any fan or power instability observed

Likely parts and accessories to stage

Item Why stage it early
Fresh SG55 front-end stack fastest way to remove front-end false faults
Known-good clamp and clean steel coupon transfer complaints stay return-path heavy
Dry air source or dryer path wet air creates repeated false machine faults
Meter and insulated probes needed for 24 V support and OCV checks

Official parts-entry shortcuts

First branch decisions

If you see... Stay in this branch first
No HF HF gap, 24 V support, and torch condition branch
HF present but no OCV control-board branch
Air flows but no cut front-end stack, gas orifice, and clamp branch
Fan or control supply drifts badly switch-power branch

Local files to open first

Bench workflow

  1. Normalize clamp, air, and torch stack before opening the case.
  2. Run P40 bench test.
  3. Separate no-HF, HF-no-OCV, and air-no-cut complaints instead of mixing them.
  4. Warm retest after correction to catch supply drift.

Release signoff

Check Result
Stable start restored pass / fail
Stable transfer restored pass / fail
Short cut completed cleanly pass / fail
No abnormal supply drift or front-end damage after retest pass / fail
Covers, grounds, and lead routing restored pass / fail

Technician: __________ Date: __________