Job Packet / WeldKing / CoolArc160

Packet use

Intake snapshot

Item Record
Serial or shop tag
Exact complaint
Stick or lift-TIG in use
Input source and branch rating
Extension cord or adapter in use
Clamp and holder condition on arrival
Fan behavior on arrival
Prior repair or board history

Likely parts and accessories to stage

Item Why stage it early
Known-good clamp and holder lead set current-path faults still mimic board failure
Simple TIG torch and fresh tungsten needed to prove lift-TIG branch after stick baseline
Fan branch repair materials or known-good fan path fan slowdown and auxiliary-supply complaints are common
Basic meter leads and insulated probes CN101 and fan-branch checks are central on this model

Official parts-entry shortcuts

First branch decisions

If you see... Stay in this branch first
OCV around 30 V with healthy bus capacitor-board branch
Low OCV with healthy high-voltage bus capacitor-board branch
No OCV with healthy bus inverter-board branch
Fan slows and arc dies auxiliary-supply or capacitor-board branch
Lift-TIG tungsten sticking start-current, control, or calibration-sensitive branch

Local files to open first

Bench workflow

  1. Capture branch power, clamp condition, and fan behavior before opening the case.
  2. Run the electrical checkpoints in CoolArc160 bench test.
  3. Prove a simple stick baseline first and separate low OCV from no OCV before deeper repair.
  4. Only after stick passes, prove lift-TIG if the complaint or package requires it.

Release signoff

Check Result
Stick baseline restored pass / fail
Lift-TIG branch restored if required pass / fail
Fan remains stable through warm test pass / fail
No abnormal heat at plug, clamp, or holder pass / fail
Covers, grounds, and lead routing restored pass / fail

Technician: __________ Date: __________