Job Packet / WeldKing / CoolCut40air

Packet use

Intake snapshot

Item Record
Serial or shop tag
Exact complaint
Internal mode, external mode, or both affected
Water-trap condition on arrival
Torch front-end condition
Clamp placement on arrival
Any dual-air or rear-inlet flow observed

Likely parts and accessories to stage

Item Why stage it early
Fresh SG55 front-end stack fastest way to remove torch-side false faults
Dry external air source needed to separate internal-air package faults from base plasma faults
Known-good clamp and clean steel coupon transfer complaints stay return-path heavy
Meter and insulated probes needed when valve or compressor-control proving is required

Official parts-entry shortcuts

First branch decisions

If you see... Stay in this branch first
Complaint exists only in internal mode compressor or internal-valve branch
Both air paths move together external solenoid or control branch
Complaint exists only in external mode hose and external-air branch
Backward purge restores one-air-path behavior contamination or stuck-valve branch
Moisture or sputter signs filter, water-trap, and front-end branch

Local files to open first

Bench workflow

  1. Normalize torch stack, clamp, and both air modes.
  2. Run CoolCut40air bench test.
  3. Keep internal-mode and external-mode symptoms separated, and note whether both air paths ever move together.
  4. Warm retest after correction to catch moisture, dual-air, or valve drift.

Release signoff

Check Result
Internal-air mode restored pass / fail
External-air mode restored if used pass / fail
Stable start and cut restored pass / fail
No dual-air or contamination symptom remains pass / fail
Covers, grounds, and lead routing restored pass / fail

Technician: __________ Date: __________