MAG251 Fault Workflow Router

This router gives the fastest document order for the highest-value MAG251 complaints.

Complaint Routing

Incoming complaint Open first Then open Then open if the complaint remains Why this order works
arc feels rough or ripple-heavy MAG251 measurement card MAG251 parts substitution card MAG251 board opening map the right order is chart-correct plain-steel setup and external branch first, then the opening map only if the rough arc stays with the machine
wire feeds the wrong direction after board work MAG251 measurement card MAG251 board opening map MAG251 job packet post-service direction faults belong in install or motor-direction logic before random part swapping
only the spool gun or aluminum branch fails MAG251 parts substitution card MAG251 guide MAG251 job packet branch-only complaints still belong to the external spool-gun and drive-roll path before internal work
trigger starts feed but gas or start behavior is still wrong MAG251 measurement card MAG251 board opening map MAG251 guide the gas-valve and control branch is faster to prove from the card and opening map than from blind teardown

Official Parts Exit Paths

Stop Rules

Open Next