Job Packet / WeldKing / CUT65

Packet use

Intake snapshot

Item Record
Serial or shop tag
Exact complaint
No pilot, weak pilot, or no-transfer complaint
Air pressure under flow
Clamp placement on arrival
Torch-head mechanical condition
Guide or stand-off hardware in use

Likely parts and accessories to stage

Item Why stage it early
Fresh A81 front-end stack fastest way to remove torch-side false faults
Dry air source pressure and dryness directly change pilot behavior
Known-good clamp and clean steel coupon transfer complaints stay return-path heavy
Guide or circle hardware only if the complaint involves tracking separates guide faults from start faults

Official parts-entry shortcuts

First branch decisions

If you see... Stay in this branch first
Pilot changes with pressure correction air branch
Pilot changes with RV1 only pilot-maintain-current branch
Tracking complaint with healthy pilot guide and stand-off branch
Freehand cut is healthy but guided cut is not guide, stand-off, or circle-hardware branch
Postflow normal but still no start torch mechanics first, then control branch

Local files to open first

Bench workflow

  1. Normalize torch head, air pressure, and clamp.
  2. Run CUT65 bench test.
  3. Prove a freehand baseline before trusting any guide-hardware complaint.
  4. Keep pressure-sensitive and guide-hardware complaints separate, then warm retest for pilot dropout.

Release signoff

Check Result
Stable pilot restored pass / fail
Stable transfer restored pass / fail
Freehand baseline restored before guide proving pass / fail
Short cut completed cleanly pass / fail
Covers, grounds, and lead routing restored pass / fail

Technician: __________ Date: __________