Job Packet / WeldKing / ThunderCut65

Packet use

Intake snapshot

Item Record
Serial or shop tag
Exact complaint
No start, weak pilot, or delayed restrike complaint
Air pressure under flow
Clamp placement on arrival
Torch-head mechanical condition
Guide or stand-off hardware in use

Likely parts and accessories to stage

Item Why stage it early
Fresh A81 front-end stack fastest way to remove torch-side false faults
Dry air source pressure and dryness directly change restrike behavior
Known-good clamp and clean steel coupon transfer complaints stay return-path heavy
Guide hardware only if the complaint involves tracking separates guide faults from torch faults

Official parts-entry shortcuts

First branch decisions

If you see... Stay in this branch first
Postflow normal but no start torch-head mechanics branch
Pilot changes with pressure or RV1 air and pilot-maintain-current branch
Delayed restrike after warm-up pressure, torch-head, and guide branch
Tracking complaint with healthy pilot guide and stand-off hardware branch
Freehand cut is healthy but guided cut is not guide, stand-off, or circle-kit hardware branch

Local files to open first

Bench workflow

  1. Normalize torch head, air pressure, and clamp.
  2. Run ThunderCut65 bench test.
  3. Prove a freehand baseline before trusting any guide-hardware complaint.
  4. Keep pressure-sensitive and guide-hardware complaints separated, then warm retest for restrike delay.

Release signoff

Check Result
Stable pilot restored pass / fail
Stable transfer restored pass / fail
Freehand baseline restored before guided cut pass / fail
Short cut completed cleanly pass / fail
Covers, grounds, and lead routing restored pass / fail

Technician: __________ Date: __________