This router gives the fastest document order for the highest-value A100 complaints.
| Incoming complaint | Open first | Then open | Then open if the complaint remains | Why this order works |
|---|---|---|---|---|
| machine is dead but there may still be upstream DC | A100 measurement card | A100 board opening map | A100 guide | the dead-machine split belongs in rectifier and low-voltage proof first |
| no output or no OCV with otherwise healthy power | A100 measurement card | A100 board opening map | A100 job packet | once the current path is proven, the route shifts cleanly into the output branch |
| blinking power light or fan-related collapse | A100 measurement card | A100 board opening map | A100 guide | support-power and fan evidence come before random board replacement |
| weak arc changes with clamp or outlet quality | A100 parts substitution card | A100 guide | A100 job packet | current-path and utility-path complaints still belong outside the machine first |
| arc feels wrong after lead service or rod change | A100 parts substitution card | A100 measurement card | A100 guide | polarity, rod baseline, and current-path proof still beat internal teardown |
KAA20010: official product page07000460: official product page07000461: official product page