WeldKing Service Workflow Bundle

This is the print-ready WeldKing shop workflow bundle. Use it when the machine is in the WeldKing family and you want one packet to route the job from intake to release.

Routing order

  1. Start with WeldKing brand index.
  2. Use WeldKing service triage dashboard for the first complaint-to-model split.
  3. Use WeldKing fault-branch matrix if the subsystem is not yet clear.
  4. Open WeldKing local reference manifest when you need the exact local file.
  5. Move to the matching packet in WeldKing job packet pack.
  6. Run the matching sheet in WeldKing bench test pack.

Highest-value model routing

Incoming model Start here Bench test
CoolArc160 job packet bench sheet
CoolArc200 job packet bench sheet
CoolTIG220 job packet bench sheet
CoolCut40air job packet bench sheet
ThunderCut65 job packet bench sheet
MigSonic145 job packet bench sheet
MigSonic252S+SS20 job packet bench sheet
TIG200PACDC job packet bench sheet
CUT40 job packet bench sheet
CUT65 job packet bench sheet
MAG211 job packet bench sheet
MAG251 job packet bench sheet
MAG255 job packet bench sheet
MultiSonic220 job packet bench sheet
PulseWave200 job packet bench sheet

CoolArc160 and CoolArc200 workflow rules

MultiSonic220 and PulseWave200 workflow rules

MAG workflow rules

CoolTIG220, CoolCut40air, and ThunderCut65 workflow rules

MigSonic145, MigSonic252S+SS20, TIG200PACDC, CUT40, and CUT65 workflow rules

Official Parts Exit Shortcuts

Stop Before Internal Repair When

Intake sheet

Item Record
Model and serial
Exact complaint
Stick, MIG, TIG, or plasma process in use
Input source and branch quality
Input class, VRD, or reset/debug state as found
Wire size, air mode, or torch-front-end state as found
Plug, adapter, or extension path
Torch polarity, gas flow, gun, feeder, or remote package
Visible fan, display, HF, or feed behavior on arrival
Local reference folder used

Diagnosis log

Step Observation or measurement Branch kept alive Next action
1
2
3
4
5

Parts and wear items used

Item used Part number or source Why it was used Installed yes / no
1
2
3
4

Bench-test signoff

Check Result
Baseline process restored pass / fail
Original complaint path repeated pass / fail
Warm retest completed pass / fail
No abnormal heat, feed drift, HF drift, or fan collapse pass / fail
Correct input class, state behavior, and accessory package documented on release pass / fail

Release signoff

Check Result
Machine closed and hardware secure pass / fail
Correct accessory package returned pass / fail
Customer-facing notes captured pass / fail
Final disposition recorded pass / fail

Technician: __________ Date: __________